| At RMC, we understand the challenges you face. We have helped our clients achieve exceptional levels of manufacturing productivity and operational efficiency. These are explained below thru examples from manufacturing units where the process has been applied. |
 |
 

 
|  
Change Management  
Example 3 -- From a Cement Plant - Change Management
Number of Plants under Reliability Improvement = 3
% Of equipment covered under Reliability Improvement Plan = 62 (most critical + critical)
Other benefits for the same plant:
Seal failure analysis = presently no seal failure takes place
Bearing failure analysis = presently no unwanted/premature bearing failure takes place
Bearing selection = redesign for bearing that were giving inadequate life
Gear failure analysis = presently no undesirable gear failure takes place
Lubrication/WDA/Tribology = Lubricant cost brought down by 67%
Heat exchanger study = No heat build up for any of the critical machines
Vibration analysis = Accuracy of analysis increased to 98%
Spare parts management = Reduction in the cost of spares thru lesser use
Identification of training needs and SOP (Standard Operating Procedure)= Implemented for better operability and maintenance |
|
 |
 

 
|  
Innovation Management  
The yield of a continuous casting plant (Stand Pig Casting Machine) could not be improved beyond 92 to 93% by any of the available improvement theories and techniques, like TPM (thru JIPM), Theory Of Constraints, TOP (McKinsey model), TBEM, TQM and Six Sigma etc with 4 years of continuous effort. However with the application of Design Out For Reliability (DOFR), the yield increased to 98% plus in barely three months with minimum effort, giving the company additional profit increase by 8% on a continuous basis (the reported profit margin of the company is around Rs. 35 crores). |
|
 |
 

 
|  
Quality Improvement  
Quality Improvement through DOFR
The yield of a continuous casting plant (Stand Pig Casting Machine) could not be improved beyond 92 to 93% by any of the available improvement theories and techniques, like TPM (thru JIPM), Theory Of Constraints, TOP (McKinsey model), TBEM, TQM and Six Sigma etc with 4 years of continuous effort. However with the application of Design Out For Reliability (DOFR), the yield increased to 98% plus in barely three months with minimum effort, giving the company additional profit increase by 8% on a continuous basis (the reported profit margin of the company is around Rs. 35 crores). |
|
 |
 

 
|  
Strategy & Leadership  
With sound understanding of the varied problems existing withing the working structure of the organization we are able to render excellent services pertaining to apt strategy and motivational leadership. The service has proved to be highly fruitful for many industrial companies. |
|
|
Signature Projects
Consulting Practice
Training Programs (In-company and Public seminars)
Case Studies
Change ManagementInnovation ManagementQuality ImprovementStrategy & Leadership
View Showcase
Please take a quick tour of our Showcase & sample some of our exclusive offers.
Play Now
Highlights
National Conference We held a National Conference on...
view all.. read more..
Hot Offers
 Factory Design and Architecture
 |